Design Meetings: 35% Design Phase
Bringing the project within budget allowed for the 35% design phase to begin. As such, room sketches was slowly and methodically transitioned into design drawings while entire floor schematic drawings began to take hold. In addition, more discussion on building layout occurred as several layout options were presented to the group and one was eventually selected to for the design process.
This article was posted in Program Features.